If 10 men can complete a work in 20 days, how long will it take 8 men to do the job if they work at the same rate?
  • A. 25 days
  • B. 18 days
  • C. 20 days
  • D. 16 days
Multiply 2438.244 × by 10.
  • A. 24382.44
  • B. 24328.44
  • C. 24384.42
  • D. 24384.44
A doll is sold for Rs. 220.00. What was the cost of doll if rate of profit was 10% of the cost?
  • A. Rs. 240.00
  • B. Rs. 200.00
  • C. Rs. 210.00
  • D. Rs. 198.00
358.0074 × 100 = ?
  • A. 35800.47
  • B. 35800.74
  • C. 38500.47
  • D. 35800.00
Akbar bought a sweater for Rs. 200 and sold it Rs. 250. How much profit did Akbar get?
  • A. Rs. 50
  • B. Rs. 20
  • C. Rs. 80
  • D. Rs. 40
The number, whose 20% is 100, is:
  • A. 700
  • B. 500
  • C. 600
  • D. 400
Salaam bought a pair of shoes for Rs. 300 and sold it at Rs. 370. How much profit did Salaam get?
  • A. Rs. 20
  • B. Rs. 70
  • C. Rs. 75
  • D. Rs. 80
If 80 men dug 4 holes in 12 months, how many men would be required to dig 6 holes in 4 months?
  • A. 40 men
  • B. 410 men
  • C. 360 men
  • D. 140 men
If 15 men can do a piece of work in 8 days, how many men will finish it in 10 days?
  • A. 8
  • B. 12
  • C. 16
  • D. 14
If 3 men and 6 boys can do a work in 20 days, then 6 men and 8 boys shall take:
  • A. 20 days
  • B. 8 days
  • C. 9 days
  • D. 6 days